Case Studies
reading time
Customer: Thames Tideway
Client: Ferrovial, Laing O’Rourke (TTT Central)
Site: Kirtling Street, Battersea
Scope of works: Excavate main shaft and transport spoil to barges
Value: £1.38M
Commencement Date: October 2017
L Lynch Plant Hire & Haulage was appointed to supply operated plant to assist with excavation of the main shaft and removal of spoil inclusive of barge loading. The main shaft will consist of 63m in depth by 37m diameter where the tunnel boring machines will be launched simultaneously, one east and the other west. This is a 24/7 operation with complex shift patterns to meet.
Related Stories:
Murphy's - Ultimate Cell Hydrogen Fuel Cell Success
We want to play our part in helping the UK reach its net-zero emissions target by 2050, and are excited to share with you the results of one of our latest successful Ultimate Cell trial with our customer, Murphy, on their network rail infrastructure ...
Reducing Carbon on the A47 Blofield Scheme with Galliford Try
We're proud to be working alongside Galliford Try on the A47 Blofield to North Burlingham upgrade for National Highways, where innovation, training, and technology are driving carbon savings.Faced with limited infrastructure on this greenfield site, ...
CMDP at Bewl Water in Collaboration with Lynch
Lynch is proud to support our customer CMDP - JV on the £30M upgrade of Bewl Reservoir, as they work to ensure a safe and sustainable water supply for East Sussex and Kent. Our collaboration is powering progress across the project, with a focus...