Stay up to date with Lynch right here!
Projects
The Dawlish sea wall is officially open!
The Dawlish sea wall is officially open! Over the past four years, we have collaborated with our customers BAM and Network Rail as the sole plant supplier on their project to upgrade the sea wall in Dawlish. This was an interesting challenge for us:...
Projects
Lynch are Corporate Members of the Pipeline Industries Guild
We are delighted to announce that Lynch are now Corporate Members of the Pipeline Industries Guild! For over 60 years, the Pipeline Industries Guild has been promoting pipelines, connecting people and advancing pipeline technology. The association p...
Projects
Crossrail Works over Easter
Over Easter, Lynch Haulage was pleased to work on the Crossrail Enabling Works in Bethnal Green, London. The works are taking place to lengthen platforms, needed to allow for longer Crossrail Trains. 432 Tonnes of contaminated soil was moved from th...
Projects
New 70T Excavator lands in Dawlish
We are pleased to be welcoming one of our new Komatsu PC700LC-11 Excavators to the fleet. This machine starts work on Phase 2 of the construction of the new sea wall in Dawlish, Devon today. The project will provide protection to the town and the ra...
Projects
Long Reach Excavator at the River Humber
The River Humber Gas Pipeline Replacement is a record-breaking project and is essential in supplying up to 25% of Britain’s gas. The existing pipeline was at risk of exposure, and so a long-term solution was needed to safeguard the gas supply. ...
Projects
Charing Cross Road
Lynch was selected to work alongside Cantillon for the removal of Inert Muck Away from the former Foyles book shop on the Charing Cross Road. The job commenced on the 16th July 2018 and the last load was removed on the 13th April 2019. During these ...
Projects
HS2 Euston
July 2019 marked one year since Lynch commenced haulage on the HS2 project at Euston and to celebrate this anniversary our haulage team have managed to compile the following key facts shown below from the project to date: 4,595 lorry movements 475 ...
Projects
A14 Huntingdon to Cambridge
Provided day work Tippers and Grab Lorries on this infrastructure project, moving site won materials from various compounds to the onsite disposal sites, as well as moving aggregates around the sites, and utilising the grab lorries to place the mater...
Projects
Thames Tideway
Removed Hazardous and Non-Hazardous waste form the site preparation at Greenwich Pumping Station. Supplied aggregates to various sites including Tilbury and Northfleet. Worked alongside the principle contractor at Kirtling Street providing daywor...
Projects
Battersea Power Station
Removed over 500 loads from site. All lorries were compliant and had to follow strict traffic routes....
Projects
Embassy Gardens, Nine Elms
Removed over 1000 loads of Inert Muck from this site. Utilising this facility ensured quick turnaround times, and helped to ensure the project was completed on time....
Projects
Thames Water
Range of services carried out across the Olympic Park, providing Day Work Lorries and Muck Away on site. Utilised role of Operator Foreman to ensure that all of our onsite drivers were supported to ensure the project was carried out to specification....
Projects
Bicester East West Rail Link
Provided daywork tippers and Road sweeper’s on this infrastructure project, moving site won materials from various compounds to the onsite disposal sites....
Projects
M1 Jct 19
Utilised Grab Lorries on a day work basis on this project, all drivers had to be site inducted and hold a Critical Medical Certificate. Provided Lorries on a 24/7 rolling shift basis working alongside the principle contractor’s requirements....
Projects
Tottenham Court Road Station
Removed over 1000 loads from the construction works of this new Crossrail Station. Working 24 hours a day over 5 days a week....
Projects
Bakerloo Line Link
Worked alongside the main contractor to remove the tunnelling waste from the construction of the new Link Tunnel from the Bakerloo Line Platforms to the new Crossrail Station at the busy London Paddington Station. Had to work to very tight and demand...
Projects
Bond Street Station Update
Utilised both Grab and Tipper Lorries to remove over 500 loads from this Crossrail site in the centre of London. Ensured project completed in timescale....
Projects
Crossrail Mile End
Provided both Primary and Recycled aggregates to site. Had to ensure that all Lorries were compliant with contractor’s requirements on this major infrastructure project. Had to comply with restricted timescales and traffic management routes....
Projects
Olympic Park: London 2012
Range of services carried out across the Olympic Park, providing Day Work Lorries and Muck Away on site. Utilised role of Operator Foreman to ensure that all of our onsite drivers were supported to ensure the project was carried out to specification....