Stay up to date with Lynch - right here!
Embassy Gardens, Nine Elms
Removed over 1000 loads of Inert Muck from this site. Utilising this facility ensured quick turnaround times, and helped to ensure the project was completed on time....
Thames Water
Range of services carried out across the Olympic Park, providing Day Work Lorries and Muck Away on site. Utilised role of Operator Foreman to ensure that all of our onsite drivers were supported to ensure the project was carried out to specification....
Bicester East West Rail Link
Provided daywork tippers and Road sweeper’s on this infrastructure project, moving site won materials from various compounds to the onsite disposal sites....
M1 Jct 19
Utilised Grab Lorries on a day work basis on this project, all drivers had to be site inducted and hold a Critical Medical Certificate. Provided Lorries on a 24/7 rolling shift basis working alongside the principle contractor’s requirements....
Tottenham Court Road Station
Removed over 1000 loads from the construction works of this new Crossrail Station. Working 24 hours a day over 5 days a week....
Bakerloo Line Link
Worked alongside the main contractor to remove the tunnelling waste from the construction of the new Link Tunnel from the Bakerloo Line Platforms to the new Crossrail Station at the busy London Paddington Station. Had to work to very tight and demand...
Bond Street Station Update
Utilised both Grab and Tipper Lorries to remove over 500 loads from this Crossrail site in the centre of London. Ensured project completed in timescale....
Crossrail Mile End
Provided both Primary and Recycled aggregates to site. Had to ensure that all Lorries were compliant with contractor’s requirements on this major infrastructure project. Had to comply with restricted timescales and traffic management routes....
Olympic Park: London 2012
Range of services carried out across the Olympic Park, providing Day Work Lorries and Muck Away on site. Utilised role of Operator Foreman to ensure that all of our onsite drivers were supported to ensure the project was carried out to specification....